環(huán)境影響報告書(shū)草案評估了美國能源部提議的一項行動(dòng)可能產(chǎn)生的環(huán)境影響,該行動(dòng)旨在為密西西比州肯珀縣的先進(jìn)發(fā)電廠(chǎng)的建設和運營(yíng)提供成本分攤資金,并可能提供貸款擔保。該項目是在美國能源部的清潔煤炭電力倡議下選定的,以演示IGCC技術(shù)。密西西比電力公司也被邀請根據2005年的能源政策法案提交一份正式的貸款擔保申請。發(fā)電組件(即在美國,煤炭氣化爐、合成氣(syngas)清潔系統、聯(lián)合循環(huán)裝置和配套基礎設施將把煤炭轉化成合成氣來(lái)驅動(dòng)燃氣輪機,而燃氣輪機排出的熱廢氣將從水中產(chǎn)生蒸汽來(lái)驅動(dòng)汽輪機。這三個(gè)渦輪機合在一起將產(chǎn)生582兆瓦的電力。盡管能源部的資金只會(huì )支持IGCC電廠(chǎng),但該項目將包括新建輸電線(xiàn)路和升級一些現有的輸電線(xiàn)路、一個(gè)地表褐煤礦、一條天然氣供應管道、一條再生水供應管道和一條二氧化碳管道。這些設施的建造和操作在本“環(huán)境影響報告書(shū)”草案中被視為相互關(guān)聯(lián)的行動(dòng)。

This Draft EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding and possibly a loan guarantee for construction and operation of advanced power generation plant in Kemper County, Mississippi. The project was selected under DOE’s Clean Coal Power Initiative to demonstrate IGCC technology. Mississippi Power also was invited to submit a formal application for a loan guarantee under the Energy Policy Act of 2005. The power generation components (i.e., coal gasifiers, synthesis gas [syngas] cleanup systems, combined-cycle unit, and supporting infrastructure) would convert coal into syngas to drive gas combustion turbines, and hot exhaust gas from the gas turbines would generate steam from water to drive a steam turbine. Combined, the three turbines would generate a nominal 582 megawatts (MW) of electricity. Although DOE funding would support only the IGCC power plant, the project would include new electrical power transmission lines and upgrades of some existing transmission lines, a surface lignite mine, a natural gas supply pipeline, a reclaimed water supply pipeline, and a carbon dioxide pipeline. The construction and operation of these facilities are considered connected actions in this Draft EIS.