首頁(yè) > 資料下載 > 梅薩巴能源項目最終環(huán)境影響報告書(shū)第1卷MESABA ENERGY PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 1
梅薩巴能源項目最終環(huán)境影響報告書(shū)第1卷MESABA ENERGY PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 1 梅薩巴能源項目最終環(huán)境影響報告書(shū)第1卷MESABA ENERGY PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 1

梅薩巴能源項目最終環(huán)境影響報告書(shū)第1卷MESABA ENERGY PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 1

  • 資料類(lèi)別:
  • 資料大?。?/li>
  • 資料編號:
  • 資料狀態(tài):
  • 更新時(shí)間:2021-09-09
  • 下載次數:次
資料簡(jiǎn)介

這份最終的環(huán)境影響報告(EIS)提供了有關(guān)擬議的Mesaba能源項目的潛在環(huán)境影響的信息,該能源項目是一個(gè)煤基綜合氣化聯(lián)合循環(huán)(IGCC)發(fā)電設施,將位于明尼蘇達州東北部的Taconite稅收減免區(TTRA)。Excelsior Energy Inc. (Excelsior)提出將Mesaba能源項目分為兩個(gè)階段進(jìn)行設計、施工和運營(yíng);每一階段將名義上產(chǎn)生600兆瓦的電力(MWe)輸出到電網(wǎng),總計1200兆瓦。能源部提出的行動(dòng)是提供總計3600萬(wàn)美元的聯(lián)合資助,通過(guò)合作協(xié)議與精益求精的在清潔煤電倡議(CCPI)計劃,設計和一年期操作示范測試段階段即第一階段的總成本是目前估計在21.6億美元的合作協(xié)議。該EIS將Mesaba能源項目的兩個(gè)階段作為相互關(guān)聯(lián)的行動(dòng)來(lái)處理,即使只有第一階段將由CCPI項目共同資助。美國能源部也可以根據2005年能源政策法案為項目第一階段提供貸款擔保。貸款擔保的批準也被認為是需要接受《國家環(huán)境政策法》審查的一項重大聯(lián)邦行動(dòng)。

This Final Environmental Impact Statement (EIS) provides information about the potential environmental impacts of the proposed Mesaba Energy Project, a coal-based Integrated Gasification Combined Cycle (IGCC) electric power generating facility that would be located in the Taconite Tax Relief Area (TTRA) of northeastern Minnesota. Excelsior Energy Inc. (Excelsior) proposes to design, construct, and operate the Mesaba Energy Project in two phases; each phase would nominally generate 600 megawatts of electricity (MWe) for export to the electrical grid, 1,200 MWe total. DOE’s Proposed Action is to provide a total of $36 million in co-funding, through a cooperative agreement with Excelsior under the Clean Coal Power Initiative (CCPI) Program, for the design and one-year operational demonstration testing period for Phase I. The total cost of Phase I is currently estimated in the cooperative agreement at $2.16 billion. This EIS addresses the impacts of both phases of the Mesaba Energy Project as connected actions, even though only Phase I would be co-funded under the CCPI Program. DOE may also provide a loan guarantee to Excelsior pursuant to the Energy Policy Act of 2005 for Phase I of the proposed project. Approval of the loan guarantee is also considered a major Federal action subject to NEPA review.