首頁(yè) > 資料下載 > 最終環(huán)境影響報告書(shū)DOE/EIS-0409第1章FINAL ENVIRONMENTAL IMPACT STATEMENT DOE/EIS-0409 CHAPTER 1
最終環(huán)境影響報告書(shū)DOE/EIS-0409第1章FINAL ENVIRONMENTAL IMPACT STATEMENT DOE/EIS-0409 CHAPTER 1 最終環(huán)境影響報告書(shū)DOE/EIS-0409第1章FINAL ENVIRONMENTAL IMPACT STATEMENT DOE/EIS-0409 CHAPTER 1

最終環(huán)境影響報告書(shū)DOE/EIS-0409第1章FINAL ENVIRONMENTAL IMPACT STATEMENT DOE/EIS-0409 CHAPTER 1

  • 資料類(lèi)別:
  • 資料大?。?/li>
  • 資料編號:
  • 資料狀態(tài):
  • 更新時(shí)間:2021-09-09
  • 下載次數:次
資料簡(jiǎn)介

這個(gè)環(huán)境影響報告書(shū)(EIS)評估的潛在環(huán)境影響南方公司提出的構造和操作一個(gè)發(fā)電廠(chǎng),通過(guò)其子公司、南方公司服務(wù),Inc . (SCS)和密西西比電力公司(密西西比權力),褐煤的打開(kāi)和操作我提出的北美煤炭公司(NACC)。這兩個(gè)設施將在密西西比州中東部相鄰。該發(fā)電廠(chǎng)將建在肯珀縣,并將示范一個(gè)先進(jìn)的綜合氣化聯(lián)合循環(huán)(IGCC)發(fā)電系統。該設施將把褐煤轉化為一種合成氣(syngas),產(chǎn)生582兆瓦(額定容量)的電力,同時(shí)與傳統的褐煤發(fā)電廠(chǎng)相比,可以減少二氧化碳(CO2)、二氧化硫(SO2)、氮氧化物(NOx)、汞和顆粒物的排放。新建輸電線(xiàn)路和輸配線(xiàn)路升級改造,新建天然氣管道、中水管道、二氧化碳管道與電廠(chǎng)連接。NACC擬建的褐煤礦將位于肯珀縣的鄰近地區,但將延伸至勞德代爾縣。

This environmental impact statement (EIS) assesses the potential environmental impacts of constructing and operating a power plant proposed by Southern Company, through its subsidiaries, Southern Company Services, Inc. (SCS), and Mississippi Power Company (Mississippi Power), and the opening and operating of a lignite mine proposed by North American Coal Corporation (NACC). Both facilities would be located adjacent to each other in east-central Mississippi. The proposed power plant would be built in Kemper County and would demonstrate an advanced integrated gasification combined-cycle (IGCC) generation system. The facility would convert lignite into a synthesis gas (syngas) for generating 582 megawatts (MW) (nominal capacity) of electricity, while reducing emissions of carbon dioxide (CO2), sulfur dioxide (SO2), oxides of nitrogen (NOx), mercury, and particulates compared to conventional lignite-fired power plants. New transmission lines and transmission and distribution line upgrades, a natural gas pipeline, a reclaimed water pipeline, and CO2 pipelines would be constructed in connection with the power plant. NACC’s proposed lignite mine would be located on adjoining properties in Kemper County but would extend into Lauderdale County.

資料截圖
版權:如無(wú)特殊注明,文章轉載自網(wǎng)絡(luò ),侵權請聯(lián)系cnmhg168#163.com刪除!文件均為網(wǎng)友上傳,僅供研究和學(xué)習使用,務(wù)必24小時(shí)內刪除。
欧美AAAAAA级午夜福利_国产福利写真片视频在线_91香蕉国产观看免费人人_莉莉精品国产免费手机影院